NEWS
  • +86-18721304861
  • +86-512-63869009
  • 28 Xiaoping Avenue,Badu,Zhenze Twown,Wujiang,Suzhou City,Jiang su Province, China
Existing residential installation elevator main program which?
  • >
  • NEWS
  • >
  • Existing residential installation elevator main program which?

Existing residential installation elevator main program which?

Existing residential installation of elevators should be carried out in accordance with the law, the owners in the brewing, consultation and reach a consensus on the basis of the main working procedures include:

(A) a written application. Subject to the conditions for the implementation of the main building to the residential district (city) government designated the lead department to apply in writing, the district (city) government led the department to conduct on-site reconnaissance, put forward preliminary examination opinions. After the preliminary examination and approval, the district (city) government will organize the implementation of the main body, the owners of the Commission on behalf of the district (city) departments and units held a feasibility study will be integrated into the views of all participants to determine whether to agree to install the elevator . Clear consent, the implementation of the main work can be carried out according to law.

(B) the preparation. Implementation of the main commissioned by qualified design units to install the elevator design, design units should be responsible for the design of the installation of the lift. The design plan for the installation of the lift shall be publicized and the public notice period shall be not less than 10 working days. If the objection is received within the public announcement period, the implementing subject shall reach an agreement with the opponent. Implementation of the main body should develop elevator installation, configuration, operation and maintenance programs, and seek the views of the relevant owners in writing.

(C) to complete the formalities. Where the house is not reserved for the elevator shaft, the implementing entity shall go through the planning and management formalities at the planning department of the locality; may affect or change the facilities such as water supply, drainage, gas supply, heating, power supply, communication, fire prevention, civil air defense and lightning disaster protection. , Should be required to the relevant administrative departments for the relevant formalities; in accordance with the construction permit management regulations for the relevant construction permit procedures. Before the installation and construction of the elevator, the construction unit shall go through the procedures for the commencement of elevator construction to the special equipment safety supervision and administration department of the district (city) where it is located.

(D) Construction acceptance. Implementation of the main body should be in accordance with the laws and regulations to carry out construction drawings design, review and other work by the elevator manufacturer or its authorized installation of units with qualified installation of the elevator. After the completion of the installation of the elevator project, the implementation of the main body should be organized survey, design, construction, supervision units to participate in the completion of acceptance, in accordance with the relevant provisions of the district (city) planning departments to apply for completion of the planning and acceptance; funds to apply for financial assistance projects should be invited Construction, finance departments to participate in the completion and acceptance, and to the construction administrative departments for civil engineering part of the completion of acceptance procedures. The files formed by the project shall be handed over to the urban construction archives management department according to the regulations. The installation of the elevator must be the special equipment inspection and testing institutions supervision and inspection, elevator use units should be put into use before or within 30 days after the use of local special equipment safety supervision and management department for registration. Existing residential elevators do not handle immovable property registration, nor are they registered on real property certificates or immovable property registers. If the ownership or use right of the relevant house changes, the transferor shall inform the transferee of the fact that the elevator is installed and hand over the relevant information.